All projects Steel Structure Installation Warehouse – LTH Ohrid, North Macedonia LocationOhrid, North Macedonia PeriodNov 2022 Client / InvestorLTH Steel structure50 t Panels800 m² Steel structure installation for Warehouse – LTH in Ohrid, North Macedonia, for LTH (Nov 2022). The scope covered 50 t of steel structure and 800 m² of panels. Project gallery Related projects Steel Structure Installation Bridge Reconstruction Bregalnica River, North Macedonia Steel Structure Installation TS Bogoslovec Sv.Nikole, North Macedonia 2021 24 t Steel Structure Installation Production facility – Prospera Cojlija Skopje, North Macedonia 2023 80 t
Steel Structure Installation Production facility – Prospera Cojlija Skopje, North Macedonia 2023 80 t